Case Reference
Delta Shopping Centre Prague
Installed micro power plant:
1× TEDOM CENTO T200 - 200 kWe
Total annual saving:
644 000 CZK
- offices
- shops and commercial services
Heating system: Building connected to central heat distribution. Electricity: Building connected to the low voltage network.
ABOUT THE CLIENT
This newly renovated administrative space in Prague 6 in the Dědina housing estate not far from Václav Havel Airport and very close to Evropská třída offers people living in Prague 6 several shops and civic amenities.
Production data
Consumption | OnSite produces KGJ | Coverage of consumption | |
---|---|---|---|
Electricity | 486 MWh | 209 MWh | 43 % |
Heating | 1115 MWh | 900 MWh | 80 % |