Case Reference
Hotel Amarilis Praha

Hotels | Prague, the Capital City

Installed micro power plant:
1× TEDOM MICRO T30 - 33 kWe

Total annual saving:
178 000 CZK

Annual savings per room: 2 656 Kč

  • 67 rooms
  • extensive conference facilities
  • 2 restaurants
  • wellness center

Heating system: In-house gas boiler room. Electricity: Building connected to the high voltage network.

ABOUT THE CLIENT

Hotel Amarilis is a stylish hotel offering disabled access which is located in the very centre of Prague not far from Wenceslas Square. The original building was designed sometime around 1929 by one of our leading functionalists, the architect Ludvík Kysela, as a multifunctional building used by the Patria insurance company and also housing luxury flats. During renovation of the building, Feng Shui elements were also used. The aim of the project was to create a pleasant and harmonious space full of positive energy.

ONSITE POWER MICRO POWER PLANT

Installation of the Tedom T30 unit is connected in parallel to the existing gas boiler heating system. During the summer months, the unit is capable of covering heat consumption in the hotel and a large part of the electricity requirement. During the winter months, the existing gas boiler is used as an additional source of heat during peak times.

Production data

Consumption OnSite produces KGJ Coverage of consumption
Heating 571 MWh 384 MWh 67 %
Electricity 442 MWh 157 MWh 36 %