Case Reference
Thimm Všetaty

Industrial buildings | Central Bohemian

Installed micro power plant:
1× TEDOM CENTO T200 - 200 kWe

Total annual saving:
175 000 CZK

  • production halls
  • warehouses
  • administrative buildings

Heating system: In-house gas boiler room. Electricity: Building connected to the high voltage network.

ABOUT THE CLIENT

Highpack is filled with people to whom THIMM owes its merits: inventiveness, flexibility, certainty and growth. These values also represent a promise to customers and partners. The aim is to continue to be that which they are today: an independent family business with capable employees, thanks to whom they are able to maintain a leading position.

Production data

Consumption OnSite produces KGJ Coverage of consumption
Heating 931 MWh 872 MWh 94 %
Electricity 5913 MWh 693 MWh 12 %